{"id":13795,"date":"2025-07-17T15:13:31","date_gmt":"2025-07-17T13:13:31","guid":{"rendered":"https:\/\/onload.reinhausen.com\/de\/?p=13795"},"modified":"2025-07-17T15:13:32","modified_gmt":"2025-07-17T13:13:32","slug":"green-hydrogen-basf-efficient-electrolysis-harmonic-filter","status":"publish","type":"post","link":"https:\/\/onload.reinhausen.com\/en\/07-2025\/green-hydrogen-basf-efficient-electrolysis-harmonic-filter\/","title":{"rendered":"Green hydrogen for BASF"},"content":{"rendered":"\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<p class=\"has-drop-cap\">Here in this hall at the BASF site in Lud\u00adwigshafen is the heart of Germany\u2019s largest pro\u00adton exchange mem\u00adbrane elec\u00adtrolyz\u00ader (PEM) with a con\u00adnect\u00aded load of 54 megawatts. The plant\u2019s 72 stacks can pro\u00adduce 8,000 tons of CO<sub>2<\/sub>-free hydro\u00adgen per year using elec\u00adtric\u00adi\u00adty from renew\u00adable ener\u00adgy sources. The hydro\u00adgen is then fed into the site\u2019s H<sub>2<\/sub> net\u00adwork and is used, among oth\u00ader things, as a start\u00ading mate\u00adr\u00adi\u00adal for the pro\u00adduc\u00adtion of basic chem\u00adi\u00adcal prod\u00aducts. MR con\u00adtributes to sta\u00adble and effi\u00adcient hydro\u00adgen pro\u00adduc\u00adtion with on-load tap-chang\u00aders in the elec\u00adtrol\u00ady\u00adsis trans\u00adform\u00aders and com\u00adpact GRIDCON\u00ae ACF har\u00admon\u00adic fil\u00adters.<\/p>\n\n\n\n<div class=\"wp-block-group mgznkr-elements mgznkr-box\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h5 class=\"wp-block-heading\"><strong><i class=\"mgznkr-icon fa fa-fas fa-arrow-right fas\"><\/i><\/strong> <a href=\"http:\/\/www.reinhausen.com\/h2\" data-type=\"link\" data-id=\"www.reinhausen.com\/h2\" target=\"_blank\" rel=\"noreferrer noopener\">Read more about MR\u2019s hydrogen expertise<\/a><\/h5>\n<\/div><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Here in this hall at the BASF site in Lud\u00adwigshafen is the heart of Germany\u2019s largest pro\u00adton exchange mem\u00adbrane elec\u00adtrolyz\u00ader (PEM) with a con\u00adnect\u00aded load of 54 megawatts.\u2026<\/p>\n","protected":false},"author":33,"featured_media":14520,"comment_status":"closed","ping_status":"open","sticky":false,"template":"template-cover.php","format":"standard","meta":{"_acf_changed":false,"wp_typography_post_enhancements_disabled":false,"footnotes":""},"categories":[44,1],"tags":[],"class_list":["post-13795","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-07-2025","category-onload"],"acf":[],"_links":{"self":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/13795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/users\/33"}],"replies":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/comments?post=13795"}],"version-history":[{"count":8,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/13795\/revisions"}],"predecessor-version":[{"id":14661,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/13795\/revisions\/14661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/media\/14520"}],"wp:attachment":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/media?parent=13795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/categories?post=13795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/tags?post=13795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}