{"id":14754,"date":"2025-12-16T15:46:48","date_gmt":"2025-12-16T14:46:48","guid":{"rendered":"https:\/\/onload.reinhausen.com\/de\/?p=14754"},"modified":"2026-02-05T16:19:40","modified_gmt":"2026-02-05T15:19:40","slug":"future-factory-expansions-at-reinhausen-worldwide","status":"publish","type":"post","link":"https:\/\/onload.reinhausen.com\/en\/12-2025\/future-factory-expansions-at-reinhausen-worldwide\/","title":{"rendered":"Factory of the future"},"content":{"rendered":"\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<p class=\"has-drop-cap\">The year is 2030. In the Haslbach dis\u00adtrict of Regens\u00adburg, pro\u00adduc\u00adtion at Maschi\u00adnen\u00adfab\u00adrik Rein\u00adhausen is run\u00adning at full speed. There is a bus\u00adtle of activ\u00adi\u00adty in the state-of-the-art fac\u00adto\u00adry cov\u00ader\u00ading an area of 90,000 square meters: around 1,800 employ\u00adees work at the site, almost twice as many as \ufb01ve years ago. Dri\u00adver\u00adless trans\u00adport sys\u00adtems autonomous\u00adly bring the com\u00adpo\u00adnents from the sig\u00adni\ufb01\u00adcant\u00adly expand\u00aded mate\u00adri\u00adals man\u00adage\u00adment cen\u00adter to the work\u00adsta\u00adtions, where skilled employ\u00adees assem\u00adble them into \ufb01nished on-load tap-chang\u00aders. Robots are also at work, man\u00adu\u00adfac\u00adtur\u00ading the ECOTAP<sup>\u00ae<\/sup> VPD<sup>\u00ae<\/sup> on semi-auto\u00admat\u00aded pro\u00adduc\u00adtion lines.<\/p>\n\n\n\n<p>This sce\u00adnario is not yet real\u00adi\u00adty, but this future is already being active\u00adly built today. \u201cWe want to dou\u00adble our pro\u00adduc\u00adtion capac\u00adi\u00adty in the next few years and also upgrade our tech\u00adnol\u00ado\u00adgy sig\u00adni\ufb01\u00adcant\u00adly,\u201d says Thomas Kien\u00adberg\u00ader, who, as plant man\u00adag\u00ader, is joint\u00adly respon\u00adsi\u00adble for the expan\u00adsion of the tap-chang\u00ader fac\u00adto\u00adries world\u00adwide. After sev\u00ader\u00adal con\u00adstruc\u00adtion phas\u00ades, the entire Regens\u00adburg pro\u00adduc\u00adtion is to take place at the Haslbach site. \u201cThis is also much more effi\u00adcient from a logis\u00adti\u00adcal point of view, because we save on trav\u00adel between the two plants,\u201d says Kien\u00adberg\u00ader. The main plant in Regens\u00adburg will be expand\u00aded into an agile head\u00adquar\u00adters where, among oth\u00ader things, new inno\u00adva\u00adtions will be devel\u00adoped. In addi\u00adtion, there will be a spa\u00adcious cus\u00adtomer cen\u00adter to show\u00adcase the lat\u00adest prod\u00aducts, ser\u00advices, and solu\u00adtions.\u201d&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group alignwide mgznkr-elements mgznkr-box\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-columns alignwide no-margin-top no-margin-bottom is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<h2 class=\"wp-block-heading has-text-align-center no-margin-bottom\" style=\"font-size:60px\">+<span class=\"mgznkr-counter m4w-counter  \" data-mode=\"de\" data-delay=\"120\" data-time=\"1500\" data-val=\"100\">0<\/span>%<\/h2>\n\n\n\n<h6 class=\"wp-block-heading has-text-align-center no-margin-top\">Production in Regensburg and worldwide is set to double by 2030.<\/h6>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:10px\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<h2 class=\"wp-block-heading has-text-align-center no-margin-bottom\" style=\"font-size:60px\"><span class=\"mgznkr-counter m4w-counter  \" data-mode=\"de\" data-delay=\"120\" data-time=\"1500\" data-val=\"90.00\">0<\/span>m\u00b2<\/h2>\n\n\n\n<h6 class=\"wp-block-heading has-text-align-center no-margin-top\">of floor space will be available in Haslbach after the final expansion stage.<\/h6>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:10px\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<h2 class=\"wp-block-heading has-text-align-center no-margin-bottom\" style=\"font-size:60px\"><span class=\"mgznkr-counter m4w-counter  \" data-mode=\"de\" data-delay=\"120\" data-time=\"1500\" data-val=\"1.800\">0<\/span><\/h2>\n\n\n\n<h6 class=\"wp-block-heading has-text-align-center no-margin-top\">employees will be able to work at the Haslbach site from 2029.<\/h6>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">First expansion stage completed&nbsp;<\/h2>\n\n\n\n<p>The \ufb01rst stage of expan\u00adsion has already been com\u00adplet\u00aded. In Octo\u00adber 2025, a new 7,200 square-meter hall was opened which will ensure the con\u00adtin\u00adued mas\u00adsive expan\u00adsion of capac\u00adi\u00adties for VACUTAP<sup>\u00ae<\/sup> VM and VR next year as well. In addi\u00adtion, ECOTAP<sup>\u00ae<\/sup> VPD<sup>\u00ae<\/sup> is to be pro\u00adduced in this hall in the future\u2013where many thou\u00adsands of units per year will be pos\u00adsi\u00adble thanks to a semi-auto\u00admat\u00aded line. \u201cIn the next step, for which we will start con\u00adstruc\u00adtion in 2026, we will mas\u00adsive\u00adly expand the mate\u00adri\u00adals man\u00adage\u00adment cen\u00adter because our ware\u00adhouse is burst\u00ading at the seams in view of the increase in pro\u00adduc\u00adtion.\u201d<\/p>\n\n\n\n<p>But there is even more in the pipeline: a new two-sto\u00adry assem\u00adbly hall is also to be built to cre\u00adate even more space for pro\u00adduc\u00adtion, with com\u00adple\u00adtion of the largest con\u00adstruc\u00adtion phase planned for 2028. But it is not only the expan\u00adsion of space that will help to mas\u00adsive\u00adly increase pro\u00adduc\u00adtion; new and mod\u00adern equip\u00adment and the automa\u00adtion of process\u00ades will fur\u00adther increase man\u00adu\u00adfac\u00adtur\u00ading effi\u00adcien\u00adcy. For exam\u00adple, a new paint shop will be built where robots will take over a sig\u00adni\ufb01\u00adcant part of the work in the future: \u201cThis will not only make pro\u00adduc\u00adtion more effi\u00adcient, but also takes us one step fur\u00adther in terms of qual\u00adi\u00adty,\u201d says Kien\u00adberg\u00ader.&nbsp;<\/p>\n\n\n\n<div class=\"wp-block-group alignwide\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<blockquote class=\"wp-block-quote is-style-large yellow-stripe is-layout-flow wp-block-quote-is-layout-flow\"><div class=\"wp-block-image\">\n<figure class=\"alignright size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Johannes-Gebauer-Sales-Director-Europe-Kopie.webp\" alt class=\"wp-image-14989\" style=\"width:200px\" srcset=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Johannes-Gebauer-Sales-Director-Europe-Kopie.webp 600w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Johannes-Gebauer-Sales-Director-Europe-Kopie-300x300.webp 300w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Johannes-Gebauer-Sales-Director-Europe-Kopie-150x150.webp 150w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Johannes-Gebauer-Sales-Director-Europe-Kopie-540x540.webp 540w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\"><\/figure>\n<\/div>\n\n\n<p>\u201cFor most prod\u00aducts, we can once again meet our cus\u00adtomers\u2019 desired deliv\u00adery dates. By expand\u00ading the plant in Regens\u00adburg and dou\u00adbling capac\u00adi\u00adty, we are ensur\u00ading that we will remain a reli\u00adable part\u00adner for man\u00adu\u00adfac\u00adtur\u00aders and ener\u00adgy sup\u00adpli\u00aders in the future.\u201d&nbsp;<\/p>\n<cite>Johannes Gebauer, Sales Direc\u00adtor Europe at MR<\/cite><\/blockquote>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Significantly shorter delivery times&nbsp;<\/h2>\n\n\n\n<p>In addi\u00adtion to these long-term invest\u00adments, MR has already shift\u00aded into high gear over the past two years and mas\u00adsive\u00adly increased pro\u00adduc\u00adtion on the exist\u00ading premis\u00ades with fast-act\u00ading mea\u00adsures. \u201cIn the last four months alone, we have reduced deliv\u00adery times by 25 per\u00adcent,\u201d says Kien\u00adberg\u00ader. This has been achieved, among oth\u00ader things, by intro\u00adduc\u00ading three-shift oper\u00ada\u00adtion, addi\u00adtion\u00adal pro\u00adduc\u00adtion equip\u00adment and new staff. In pro\u00adduc\u00adtion alone, the work\u00adforce is grow\u00ading by 20 per\u00adcent per year.<\/p>\n\n\n\n<p>Johannes Gebauer, Sales Direc\u00adtor Europe at MR, can also con\ufb01rm that the mea\u00adsures are work\u00ading: \u201cWe are now much bet\u00adter able to again meet cus\u00adtomers\u2019 desired deliv\u00adery dates and, with a few excep\u00adtions, we again have nor\u00admal deliv\u00adery times for almost all prod\u00aducts.\u201d In order to process cus\u00adtomer inquiries more quick\u00adly and reduce the effort in-volved in order pro\u00adcess\u00ading, the sales teams have also increased staff. Gebauer empha\u00adsizes: \u201cWe have always met our promised deliv\u00adery dates, and we will con\u00adtin\u00adue to do so in the future.\u201d&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Global expansion&nbsp;<\/h2>\n\n\n\n<p>The high\u00adest qual\u00adi\u00adty stan\u00addards in pro\u00adduc\u00adtion are also essen\u00adtial for glob\u00adal expan\u00adsion. In the US, new pro\u00adduc\u00adtion facil\u00adi\u00adties were put into oper\u00ada\u00adtion last year at the Hum\u00adboldt, Ten\u00adnessee site. This was fol\u00adlowed in August 2025 by the ground\u00adbreak\u00ading cer\u00ade\u00admo\u00adny for the next plant expan\u00adsion. In Chi\u00adna, pro\u00adduc\u00adtion of the VACUTAP<sup>\u00ae<\/sup> VM is being expand\u00aded so that, in the future, our col\u00adleagues in Suzhou will not only assem\u00adble a larg\u00ader vol\u00adume, but also more vari\u00adants of this on-load tap-chang\u00ader, which is very pop\u00adu\u00adlar with ener\u00adgy sup\u00adpli\u00aders. \u201cOur mar\u00adkets are inter\u00adna\u00adtion\u00adal, and we want to be clos\u00ader to our cus\u00adtomers and make our pro\u00adduc\u00adtion net\u00adwork more \ufb02ex\u00adi\u00adble,\u201d says Kien\u00adberg\u00ader.&nbsp;<\/p>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide mgznkr-elements mgznkr-box\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<h3 class=\"wp-block-heading\">How Reinhausen is growing worldwide:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<div class=\"wp-block-columns are-vertically-aligned-center is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China.webp\" alt class=\"wp-image-14967\" srcset=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China.webp 1920w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-300x169.webp 300w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-1024x576.webp 1024w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-768x432.webp 768w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-1536x864.webp 1536w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-540x304.webp 540w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-Produktionslinie-China-1080x608.webp 1080w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/figure>\n\n\n\n<h4 class=\"wp-block-heading no-margin-top\">New production line in China&nbsp;<\/h4>\n\n\n\n<p>Series pro\u00adduc\u00adtion of the VACUTAP<sup>\u00ae<\/sup> VM has suc\u00adcess\u00adful\u00adly start\u00aded at the Suzhou site, for which a new line was set up and com\u00admis\u00adsioned in record time. This has sig\u00adnif\u00adi\u00adcant\u00adly short\u00adened the path to this cov\u00adet\u00aded tap chang\u00ader for trans\u00adformer man\u00adu\u00adfac\u00adtur\u00aders in Chi\u00adna, while main\u00adtain\u00ading the the high\u00adest qual\u00adi\u00adty stan\u00addards.&nbsp;<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited.webp\" alt class=\"wp-image-14969\" srcset=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited.webp 1920w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-300x169.webp 300w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-1024x576.webp 1024w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-768x432.webp 768w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-1536x864.webp 1536w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-540x304.webp 540w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Reinhausen-India-Private-Limited-1080x608.webp 1080w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/figure>\n\n\n\n<h4 class=\"wp-block-heading no-margin-top\">More power for India&nbsp;<\/h4>\n\n\n\n<p>In India, the new com\u00adpa\u00adny Rein\u00adhausen India Pri\u00advate Lim\u00adit\u00aded (RIN) was offi\u00adcial\u00adly opened this year in Pune with a fes\u00adtive cer\u00ade\u00admo\u00adny. As a ser\u00advice and sales com\u00adpa\u00adny, this Rein\u00adhausen sub\u00adsidiary is respon\u00adsi\u00adble for MR\u2019s busi\u00adness with pre\u00admi\u00adum solu\u00adtions tai\u00adlored to local needs.&nbsp;<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33%\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee.webp\" alt class=\"wp-image-14968\" srcset=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee.webp 1920w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-300x169.webp 300w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-1024x576.webp 1024w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-768x432.webp 768w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-1536x864.webp 1536w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-540x304.webp 540w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/Maschinenfabrik-Reinhausen-USA-Humboldt-Tennessee-1080x608.webp 1080w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/figure>\n\n\n\n<h4 class=\"wp-block-heading no-margin-top\">Expansion in the USA&nbsp;<\/h4>\n\n\n\n<p>In August, the ground\u00adbreak\u00ading cer\u00ade\u00admo\u00adny took place for the expan\u00adsion of Rein\u00adhausen Man\u00adu\u00adfac\u00adtur\u00ading in Hum\u00adboldt. The pro\u00adduc\u00adtion area at the site is to be expand\u00aded by 12,000 square meters. By 2030, pro\u00adduc\u00adtion capac\u00adi\u00adty is expect\u00aded to increase by 50 per\u00adcent, with the poten\u00adtial to dou\u00adble if demand con\u00adtin\u00adues to grow.&nbsp;<\/p>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<h2 class=\"wp-block-heading\">More high voltage in Dresden&nbsp;<\/h2>\n\n\n\n<p>With the ener\u00adgy tran\u00adsi\u00adtion, demand for HIGHVOLT sys\u00adtems is also increas\u00ading. The Rein\u00adhausen sub\u00adsidiary is there\u00adfore expand\u00ading rapid\u00adly.&nbsp;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden.webp\" alt class=\"wp-image-14971\" srcset=\"https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden.webp 1920w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-300x169.webp 300w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-1024x576.webp 1024w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-768x432.webp 768w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-1536x864.webp 1536w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-540x304.webp 540w, https:\/\/onload.reinhausen.com\/en\/wp-content\/uploads\/sites\/26\/2025\/12\/HIGHVOLT-Dresden-1080x608.webp 1080w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\"><\/figure>\n<\/div>\n\n\n<p>The Rein\u00adhausen sub\u00adsidiary HIGHVOLT is also expand\u00ading, as the demand for test\u00ading, mea\u00adsure\u00adment, and mon\u00adi\u00adtor\u00ading tech\u00adnol\u00ado\u00adgy is grow\u00ading enor\u00admous\u00adly with the glob\u00adal expan\u00adsion of renew\u00adable ener\u00adgies. A new pro\u00adduc\u00adtion site has there\u00adfore been built in the Klip\u00adphausen indus\u00adtri\u00adal park near Dres\u00adden, which will be fur\u00adther expand\u00aded in the com\u00ading years. Part of the pro\u00adduc\u00adtion takes place in the four halls, which cur\u00adrent\u00adly cov\u00ader a total of 10,500 square meters, and sys\u00adtems ready for ship\u00adment are also pre\u00adpared for deliv\u00adery here.<\/p>\n\n\n\n<p>By the end of 2025, 50 employ\u00adees are expect\u00aded to be work\u00ading at the new loca\u00adtion. The expan\u00adsion in Klip\u00adphausen also means that there is more space for increased pro\u00adduc\u00adtion and new, mod\u00adern facil\u00adi\u00adties at the head\u00adquar\u00adters in Dres\u00adden. Michael Fr\u00f6schke, Head of Pro\u00adduc\u00adtion and Plant Plan\u00adning, explains: \u201cWith the scal\u00adable loca\u00adtion in Klip\u00adphausen and the many expan\u00adsion stages already imple\u00adment\u00aded today, we have more than laid the foun\u00adda\u00adtion for long-term sales growth. We are con\u00adtin\u00adu\u00adous\u00adly opti\u00admiz\u00ading our process\u00ades, becom\u00ading more effi\u00adcient, and adapt\u00ading to mar\u00adket con\u00addi\u00adtions. The plant struc\u00adture plan\u00adning shows that HIGHVOLT is in the midst of an excit\u00ading and chal\u00adleng\u00ading trans\u00adfor\u00adma\u00adtion process.\u201d&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the largest invest\u00adment offen\u00adsive in the company\u2019s his\u00adto\u00adry, Rein\u00adhausen is dou\u00adbling its glob\u00adal capac\u00adi\u00adty by 2030 and expand\u00ading its pro\u00adduc\u00adtion facil\u00adi\u00adty in Regens\u00adburg into a state-of-the-art man\u00adu\u00adfac\u00adtur\u00ading plant. An overview. <\/p>\n","protected":false},"author":4,"featured_media":14755,"comment_status":"closed","ping_status":"open","sticky":false,"template":"template-cover.php","format":"standard","meta":{"_acf_changed":false,"wp_typography_post_enhancements_disabled":false,"footnotes":""},"categories":[45,1],"tags":[],"class_list":["post-14754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-12-2025","category-onload"],"acf":[],"_links":{"self":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/14754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/comments?post=14754"}],"version-history":[{"count":4,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/14754\/revisions"}],"predecessor-version":[{"id":15748,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/posts\/14754\/revisions\/15748"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/media\/14755"}],"wp:attachment":[{"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/media?parent=14754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/categories?post=14754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/onload.reinhausen.com\/en\/wp-json\/wp\/v2\/tags?post=14754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}